Milestones
|
Milestone No. |
Milestone name |
Related WP(s) |
Due date (in month) |
Means of verification |
MS 1.1 |
Kick-off meeting. General assembly first meeting |
WP1 |
1 |
Minutes of the meeting |
MS 1.2 |
Web-based IP repository operative |
WP1 |
12 |
Online tool operative |
MS 1.3 |
Mid-term INSHIP ECRIA review meeting |
WP1 |
28 |
Minutes of the meeting |
MS 1.4 |
Final agreement of follow-up SHIP structure |
WP1 |
40 |
Submission of associated report (DL 1.5) |
MS 1.5 |
Final general project meeting |
WP1 |
48 |
Minutes of the meeting |
MS 2.1 |
Cost effective integration of low temperature SHIP |
WP2, WP5 |
24 |
Comparison among actual and projected CAPEX & OPEX vs. system performances |
MS 2.2 |
SHIP integration in available and innovative drying processes |
WP2, WP5 |
32 |
Guideline for SHIP integration into existing drying processes and definition of intensified drying |
MS 2.3 |
Model validation of control strategy in pilot case |
WP2 |
40 |
Model based validation of process control in SHIP installation, performing above user expectations |
MS 3.1 |
Steam integration, steam monitoring, degradation and automated cleaning survey results |
WP3 |
18 |
Completion of Deliverables 3.1 to 3.4 |
MS 3.2 |
Ageing test definition and demonstration procedures |
WP3 |
18 |
Completion of deliverable 3.6 and definition of experimental procedures of D3.9 |
MS 3.3 |
Definition of Standardized BoP and Guidelines for Cost-effective Solar Steam integration |
WP3 |
24 |
Completion of Deliverables 3.1, 3.5 & 3.7 and definition of experimental procedures of D3.8 |
MS 3.4 |
Compact line-focus optical designs |
WP3 |
36 |
Completion of Deliverable 3.10 |
MS 3.5 |
Experimental demonstrations |
WP3 |
42 |
Deliverables 3.8 and 3.9 |
MS 4.1 |
Report on mass/energy balances and solar chemical reactor concepts |
WP4 |
24 |
Report and e.g. publications/conference proceedings |
MS 4.2 |
Report on integration of thermal energy storage and/or hybridization to solar-driven processes |
WP4 |
36 |
Report and e.g.publications / conference proceedings |
MS 4.3 |
Large-scale implementation report on economic analysis, and potential for CO2 mitigation of solar-driven processes |
WP4 |
48 |
Report and e.g. publications / conference proceedings |
MS 5.1 |
Identification of emerging technologies that can enhance the potential for SHIP in low and medium temp. range |
WP5 |
24 |
Report with a description and allocation to industry on emerging technologies |
MS 5.2 |
Selection of industries and industry parks for the hybrid energy supply systems |
WP5 |
24 |
Letter of commitment of the industries and industry parks based on a pre-feasibility study |
MS 5.3 |
Decision on software program for branch concept |
WP5 |
6 |
Report on Pro/cons of different software tools for branch concept |
MS 6.1 |
Mobility actions selected by the expert panel (First Phase) |
WP6 |
12 |
Reports collecting main results of performed missions during 1st phase |
MS 6.2 |
Map of existing RTD SHIP infrastructures and resources |
WP6 |
20 |
Submission of deliverable DL 6.1 |
MS 6.3 |
Mobility actions selected by the expert panel (Second Phase) |
WP6 |
32 |
Reports collecting main results of performed missions during 2nd phase |
MS 6.4 |
Final report on exchange of staff personnel |
WP6 |
48 |
Submission of deliverable DL 6.4 |
MS 7.1 |
All National SHIP task forces activated |
WP7 |
12 |
List of National Task Force members |
MS 7.2 |
European Workshop for SHIP RTD alignment |
WP7 |
16 |
Workshop proceedings |
MS 7.3 |
Presentation of common SHIP RTD strategy to the European Commission |
WP7 |
19 |
Meeting minutes |
MS 7.4 |
National training workshops in SHIP |
WP7 |
40 |
Workshop proceedings |
MS 7.5 |
Annual Updates on Database for in-kind contributions |
WP7 |
18, 30, 42 |
Updated database |
MS 8.1 |
Preparation and distribution of innovation strategy survey |
WP8 |
9 |
Internal report on collected answers |
MS 8.2 |
Preparation and distribution of socio-economic survey |
WP8 |
20 |
Internal report on collected answers |
MS 8.3 |
SHIP innovation support Workshop |
WP8 |
42 |
Workshop minutes |